Tenders

TANESCO invites consultancy services for management of transmission line

Tanzania Electric Supply Company Limited invites consultancy services to supervise and manage the proposed 220Kv Benaco-Kyaka Transmission line in the Kagera Region, Tanzania.

Submission target date: Quarter 3 of 2023

The ultimate development objective of the project is to improve power supply through the provision of main grid electricity to the whole Kagera Region. The project will also provide reliability and affordability of electricity in the country, and enhance power evacuation for the proposed 87MW Kakono HPP and job creation.

The project will improve the supply of electricity in Tanzania in the short to long term by connecting the Power National grid to the isolated grid.

Project description

The 220kV Benaco – Kyaka Transmission Line Project comprises of:

  1. Design and construction of 220kV transmission line from Benaco in Ngara District to Kyaka in District (166.17km).
  2. Design and construction of 2x40MVA, 220/33kV substation at Benaco in Ngara District.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Verified by MonsterInsights