Construction

Moroccan-built modules delivered for UK project

Bouygues UK has completed a modular project in Canterbury, UK, with 430 modules built in a dedicated factory in Morocco

canterburyThe 491-bedroom student accommodation scheme has been innovatively delivered using modular construction. (Image source: Bouygues)

491 bedrooms were completed for student accommodation in the UK city, delivered through modular construction. A range of rooms were delivered from studios to premium rooms with an en-suite, all of which have access to a fitness studio, games area, roof terrace, courtyard, a study area and laundry facilities.

Offsite production is part of the UK Government’s roadmap for construction, and so Bouygues UK built a dedicated factory in Morocco to produce the student accommodation modules, which were then transported directly to the construction site in Canterbury for installation. This process results in a shorter build time, less disturbance on site, a reduction in risk and improved quality.

Rob Bradley, CEO of Bouygues UK, said, “Modern Methods of Construction (MMC) is a crucial part of the future for construction, and we have learned a tremendous amount from this scheme, which stands us in great stead for future modular projects. Its successful delivery is a result of great collaboration, between Bouygues UK, Linkcity, Uliving, Canterbury City Council and our colleagues in Morocco, where we built a dedicated factory to manufacture the modules. We are looking forward to utilising these skills much more going forward.”

Advertisements

Related posts

Volvo Haul Assist Now Standard In Middle East

Brena

Rokbak celebrates rebrand anniversary

admin

Orica Mining to spend $2mn on explosives plant

admin

Leave a Comment

Verified by MonsterInsights